Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





General View of Lai Wan Interchange





Completed Bridge G2





Segment Erection of Bridge ML16 at Pier NB44 by LG1





Completed Pier SB41





Segment Erection of Bridge ML13 at Pier SB37 by LG2





Construction of Abutment E in Progress





Installation of Portal Formwork at Pier NSB27





General View of Portion of Site P1-SA6(Viewing East)





Construction of Cast In-Situ Bridge EC (Panoramic View)





Construction of Cast In-Situ Bridge EC (View from Pier E1-16)





Installation of T-Pier Formwork at Pier NSB16





Installation of Working Platform for Portal Construction at Grid 4





High Rise Column Construction at Piers E1 and E2





Road Surfacing at the Slow Lane of Bridge Deck Waterproofing Site Trials