General View of Lai Wan Interchange
Completed Bridge G2
Segment Erection of Bridge ML16 at Pier NB44 by LG1
Completed Pier SB41
Segment Erection of Bridge ML13 at Pier SB37 by LG2
Construction of Abutment E in Progress
Installation of Portal Formwork at Pier NSB27
General View of Portion of Site P1-SA6(Viewing East)
Construction of Cast In-Situ Bridge EC (Panoramic View)
Construction of Cast In-Situ Bridge EC (View from Pier E1-16)
Installation of T-Pier Formwork at Pier NSB16
Installation of Working Platform for Portal Construction at Grid 4
High Rise Column Construction at Piers E1 and E2
Road Surfacing at the Slow Lane of Bridge Deck Waterproofing Site Trials