General View of Lai Wan Interchange
Completed Bridge ML16
Panoramic View of LG2 at Pier SB40
Segment Erection of Bridge ML13 at Pier SB40 by LG2
Construction of Abutment E in Progress
Segment Erection of Bridge ML9N at Pier SB29 by LG1
Construction of Portal NSB27 Completed
Construction of Cast In-Situ Bridge EC (View from Pier E1-16)
First Segment Pair Installed by Lifting Beam at Pier NSB21
Construction of Portal NSB17 in Progress
Laying of 2250mmO Stormwater Drain between Manholes SM5.44 and SM5.47
Construction of Ramp E Columns (View from Pier E4(M))
High rise column construction at Pier E1
Installation of Working Platform for Portal Construction at Grid 4