Overview of Completed Bridge Spans at P1-SA6
Segment Erection of Bridge ML15 by LG2 over West Kowloon Highway
Bridges ML9 and 10 between Grids 28 and 29 Partially Completed by LG1
Backfilling Works in Progress at Ramp E Abutment
Dismantling of Falsework at Pier NSB27 in Progress
Overview of Construction Works at Roundabout CP3/CP4
Bay 1 (between Piers E16 and 17) of Cast In-Situ Bridge EC Completed
Segment Erection of Bridge E1B by Crane at Pier E1-23
Construction of Portal NSB22 in Progress
First Segment Pair Installed by Lifting Beam at Pier NSB20
Laying of 2250mm Stormwater Drain between Manholes SM5.44 and SM5.47
Construction of Ramp E Columns (View from Pier E4(M))
High rise column construction at Pier SB10 and SB11
Working Platform for Portal Construction Installed at Grid 4