Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





Overview of Completed Bridge Spans at P1-SA6





Segment Erection of Bridge ML15 by LG2 over West Kowloon Highway





Bridges ML9 and 10 between Grids 28 and 29 Partially Completed by LG1





Backfilling Works in Progress at Ramp E Abutment





Dismantling of Falsework at Pier NSB27 in Progress





Overview of Construction Works at Roundabout CP3/CP4





Bay 1 (between Piers E16 and 17) of Cast In-Situ Bridge EC Completed





Segment Erection of Bridge E1B by Crane at Pier E1-23





Construction of Portal NSB22 in Progress





First Segment Pair Installed by Lifting Beam at Pier NSB20





Laying of 2250mm Stormwater Drain between Manholes SM5.44 and SM5.47





Construction of Ramp E Columns (View from Pier E4(M))





High rise column construction at Pier SB10 and SB11





Working Platform for Portal Construction Installed at Grid 4