Overview of Completed Bridge Spans at P1-SA6
Segment Erection of Bridge ML15 by LG2 over West Kowloon Highway
Disassembling LG1 at Grids 32 and 33
Backfilling Works in Progress at Ramp E Abutment
First Segment Pair Installed by Lifting Beam at Pier NSB27
Bay 3 (between Piers E18 and E19) of Cast In-Situ Bridge EC Completed
Overview of Construction Works at Roundabout CP3/CP4
Construction of T-Pier NSB26 in Progress
Segment Erection of Bridge E1B by Crane at Pier E1-22
Laying of 600mm Stormwater Drain between Manholes SM5.12 and 5.15
High Rise Column Construction at Pier NSB12
Installation of Scaffolding for Portal Construction at Grid 11
High Rise Column Construction at Grid 6
Working Platform for Portal Construction Installed at Grid 4