Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





Overview of Completed Bridge Spans at P1-SA6





Segment Erection of Bridge ML15 by LG2 over West Kowloon Highway





Disassembling LG1 at Grids 32 and 33





Backfilling Works in Progress at Ramp E Abutment





First Segment Pair Installed by Lifting Beam at Pier NSB27





Bay 3 (between Piers E18 and E19) of Cast In-Situ Bridge EC Completed





Overview of Construction Works at Roundabout CP3/CP4





Construction of T-Pier NSB26 in Progress





Segment Erection of Bridge E1B by Crane at Pier E1-22





Laying of 600mm Stormwater Drain between Manholes SM5.12 and 5.15





High Rise Column Construction at Pier NSB12





Installation of Scaffolding for Portal Construction at Grid 11





High Rise Column Construction at Grid 6





Working Platform for Portal Construction Installed at Grid 4