Overview of Completed Bridge Spans at P1-SA6
LG1 Reassembled at Grids 31 and 32
LG1 Reassembled while LG2 was being Transported to Grid 30
Construction of Ramp E Abutment Substantially Completed
Overview of Construction Works at Roundabout CP3/CP4
Construction of Portal NSB25 Completed
Laying of 1200mm Stormwater Drain between Manholes SM6.26 and 6.31
Second Segment Pair Installed by Lifting Beam at Pier NSB22
Construction of Abutment F1-19(M) in Progress
Segment Erection of Bridge E1A by Crane at Pier E1-17
Construction of Ramp E1 Abutment in Progress
Construction of T-Pier NSB15 in Progress
Scaffolding Installed for Portal Construction at Grid 11, and Self-Climbing Formwork was being Assembled at Grid 9
Construction of Booster Pump House in Progress
High Rise Column Construction at Grid 6
Portal Construction at Grid 4 in Progress