General view of interface with LCKV viaduct at Portal SB44
Overview of interface between Bridge G2 & H2 and the West Kowloon Highway
Panoramic view of bridge decks, viewing from Gridline 44
Parapet skins mounted onto the southern edge of Bridge ML13
TTA at Hing Wah Street W/B near Roundabout CP3/CP4
General view of the Portion of Site P1-SA6
Segment erection by LG2 at Pier NSB13
General view of bridge deck of Bridge ML4, viewing from Gridline 11
Surfacing work to roadbase at between Gridline 12 and 14
Parapet construction at southern edge of Ramp E1 near the egress
Surfacing to roadbase at between Gridline 14 and 16, near Ramp F1
Surfacing works in progress at Gridline 11 near the entrance to ACT Container Terminal
Segment erection in progress between Gridline 8 and 9 over Roundabout No. 8
General view of the works between Gridline 1 & 4, segment storage and interface pier of SCB in background