Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





General view of interface with LCKV viaduct at Portal SB44





Overview of interface between Bridge G2 & H2 and the West Kowloon Highway





Panoramic view of bridge decks, viewing from Gridline 44





Parapet skins mounted onto the southern edge of Bridge ML13





TTA at Hing Wah Street W/B near Roundabout CP3/CP4





General view of the Portion of Site P1-SA6





Segment erection by LG2 at Pier NSB13





General view of bridge deck of Bridge ML4, viewing from Gridline 11





Surfacing work to roadbase at between Gridline 12 and 14





Parapet construction at southern edge of Ramp E1 near the egress





Surfacing to roadbase at between Gridline 14 and 16, near Ramp F1





Surfacing works in progress at Gridline 11 near the entrance to ACT Container Terminal





Segment erection in progress between Gridline 8 and 9 over Roundabout No. 8





General view of the works between Gridline 1 & 4, segment storage and interface pier of SCB in background