Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





Panoramic view of bridge decks, viewing from Gridline 44





Panoramic view of bridge decks, viewing from Gridline 34





Overview of Interface between Bridge G2 & H2 and the WKH





Interface between Bridge G2 and WKH





Landscaping works at Roundabout CP3/CP4





Reinstatement of the area near Roundabout CP3/CP4 for returning to DSD





Bridge paving works to wearing course on Bridge ML8





Bridge paving works to wearing course on Ramp E1





Formwork for median barrier between Bridge ML3 and Ramp F





General view of Container Port Road South





Panoramic view of ground level works area from Gridline 7





Reinstatement of the area near Roundabout CP3/End for returning to DSD





Steel double railing at Bridge ML3





General view of the completed bridge span at P1-SA1