Panoramic view of bridge decks, viewing from Gridline 44
Panoramic view of bridge decks, viewing from Gridline 34
Overview of Interface between Bridge G2 & H2 and the WKH
Interface at Pier NB44
Sub-base for road pavement of Hing Wah Street West Eastbound
Erected steel posts for noise barrier along Bridges ML12 and ML14
Completed drainage works on Ngong Shung Road near Roundabout CP3/CP4
Landscaping works at Roundabout CP3/CP4
Construction of U-channel along the existing Container Port Road South
Bridge paving works to wearing course on Bridge ML10
Waterproofing works on Ramp E
Crash cushion barrier at the nosing of Ramp E
General view of Container Port Road South
General view of the completed bridge span at P1-SA1