Contract No. HY/2000/21 - Route 8 Ngong Shuen Chau Viaduct





Panoramic view of bridge decks, viewing from Gridline 44





Panoramic view of bridge decks, viewing from Gridline 34





New sign faces installed on existing sign gantry at Lai Wan Interchange





Landscaping area between gridlines 34 and 40





Bridge paving works to friction course on Bridges ML9 & ML10





Construction of U-channel outside the Ngong Shuen Chau Barracks





Installation of double steel railing on Ramp E





Laying of stone pebbles underneath Ramp F





General view of planter near gridline 15





General view of Roundabout CP3/End





Panoramic view of ground level road works between gridlines 9 and 15





General view of booster pump house





Laying of bituminous pavement on Bridge ML2





General view of interfacing area between NSCV and SCB